Specifications include, but are not limited to: partial removal and replacement of approximately 20,000 total SF of 2 ply roof system at multiple separate roof areas at the school. The replacement roof system will be a two ply modified bitumen system set in cold adhesive with heat welded seams and additional roof cants and crickets. The project replaces 48 new roof drains two of which are to be relocated to a new location. A new duct enclosure shall be constructed against the existing auditorium wall. This enclosure will be finished in metal siding and roofing and shall be insulated. The new enclosure roof shall drain to and external gutter system. Work also includes temporary removal and reinstallation of existing rooftop-mounted HVAC equipment in order to accomplish roof repairs and restoration beneath. The project also includes application of a white, 2-coat fluid applied roof system over the entire school roof (including backs of parapets), approximately 207,300 SF.