A. The Contractor shall provide, through the services of an instrumentation and control system subcontractor, components, system installation services, as well as required and specified ancillary services in connection with the Instrumentation, Control and Information System. B. The System includes materials, labor, tools, fees, charges, and documentation required to furnish, install, test and place in operation a complete and operable instrumentation, control and information system. C. The system shall include measuring elements, signal converters, transmitters, local control panels, digital hardware and software, remote telemetry units, signal and data transmission systems, interconnecting wiring, and pertinent accessories. D. The scope of the work to be performed under this Division includes but is not limited to the following: 1. The Contractor shall retain overall responsibility for the instrumentation and control system as specified herein. 2. Furnish and install process instrumentation and associated taps and supports as scheduled or shown on the Drawings, unless otherwise noted or supplied by equipment vendors. 3. Furnish and install local control panels, field panels and associated cabinets and panels as shown on the Drawings and as specified in Sections 40 60 00 through 40 79 99, inclusive and where included. 4. Furnish and install digital control system hardware and software as specified in Sections 40 60 00 through 40 79 99, inclusive and where included. 5. Final termination and testing of instrumentation and control system signal wiring and power supply wiring at equipment furnished under Sections 40 60 00 through 40 79 99, inclusive and where included. 6. Furnish, install, and terminate special cables for devices (e.g., instruments, printers, radios). Furnish and terminate control system communication network cables. 7. Furnish and install surge protection devices for digital equipment, local control panels, remote telemetry units, and instrumentation provided under this Division, including connections to grounding system(s) provided under Division 26. 8. Coordinate grounding requirements with the electrical subcontractor for digital equipment, local control panels, remote telemetry units, and instrumentation provided under this Division. Terminate grounding system cables at equipment provided under this Division. 9. Provide system testing, calibration, training and startup services as specified herein and as required to make systems fully operational.