Specifications include, but are not limited to: H127 – Drain -Inspect w/Camera the line to where it ties 4” line in corridor -Demo tile from affected floor area and into the corridor neighboring -Cut concrete up to 8” and remove debris from space -Excavate hole until Sanitary Sewer existing line is uncovered -Demo existing 3” cast iron sanitary sewer line from drain in H127, under the wall to the tie in at the 4” line in the corridor- Re-Plumb 3” drain line and tie into existing 4” drain line -Fill excavated area and replace concrete -Install new tiles as close to the same color as available H120- Trench Drain -Demo tile and existing stainless steel trench from affected floor area and into the walkway for the new route for this drain- Cut concrete up to 8” and remove debris from space -Excavate hole until Sanitary Sewer existing connection is uncovered and deep enough for the new route to be plumbed -Cap tie in to the existing drain and run a new 3” drain line to tie into the 3” drain line existing – Fill excavated area and replace concrete -Install new tiles as close to the same color as available