The Work consists of the construction of an approximately 85,000sf expansion of the existing Holladay Elementary School, the renovation of select areas of the existing Holladay Elementary School and associated sitework. The new elementary school building consists of a structural system with a combination of load-bearing CMU and steel framing. Interior partitions include CMU, drywall, masonry veneer, and limited amounts of wood veneer paneling. Flooring includes polished concrete, carpet tile, wood sports and stage flooring and rubber floor tile. Roofing systems include EPDM membrane and pre-finished, standing-seam metal roofing. Building features include kitchen with food service equipment, dining room, gymnasium, library, general classrooms, and administration areas. Site construction includes the construction of a new bus loop and bus canopy and expanded parking area including all grading, erosion and sediment control, stormwater management, site utilities, driveways, paving and sidewalks, fencing, site lighting, signage and landscaping. Other sitework includes a walking track and assorted pervious and impervious play areas.