The Contractor shall provide services and materials to. 1. Existing Boiler 4 and all associated pipe, electrical and controls shall be demolished and removed. New boilers shall connect to existing systems. No modifications to the central equipment or main pipe headers will be necessary. 2. Platform at rear of Boiler 4 is to remain. All of Boiler 4 equipment below and on platform are to be demolished. 3. Two new 150 psig boiler are to be new and/or extended boiler pads. Piping is to be reworked to accommodate new boiler location. 4. Electrical service at MCC on plan west of the contract drawings to be modified to accommodate new boilers. 5. Concrete pad for Boiler 3 to be extended to accommodate new Boiler. Concrete pad for existing Boiler 4 to be demolished and new pad poured to accommodate new Boiler 4 same height as Boiler 3 pad. 6. Structural supports shall be provided to support the majority of the piping from the floor. 7. Existing blowdown separator and all associated piping and controls to remain. 8. Connect to existing SCADA system in the steam plant control room. Map points as listed in the specifications to the SCADA system. 9. Prior demonstrated experience in the installation of a 20,000 to 40,000 PPH dual fuel boiler