Specifications include, but are not limited to: A. Furnish and install all material, labor, tools, miscellaneous, materials, equipment and supervision to furnish and install window treatment DRMS7 SunTek window film (or equal). • Final style, color and material for window tinting film shall be selected by owner. • Current window treatments (blinds) will be taken down by Contractor. • Polycarbonate plastic window protection covers will be removed and reinstalled once window film has been applied. • Window film shall be installed in a professional manner, with all safety precautions in connection with the work and in accordance to the manufacture’s recommendations. • The building will have heat or A/C working at the time of installation. • Contractor must provide temporary dust partitions; walk off mats and fire-retardant plastic sheeting to cover all floors and equipment. • Contractor will leave all areas as found. • All equipment, materials and work shall comply with all applicable Federal, State and local laws, ordinances, rules, regulations and codes including the Virginia OSHA Standards, the Virginia Uniform Statewide Building Code • Contractor shall perform the describe work in accordance with the manufacture’s recommendations and these specifications