Specifications include, but are not limited to:The purpose of this Invitation for Bid is to solicit bids for all labor, equipment, and materials necessary for installing a new floating floor over an existing asbestos containing vinyl tile floor at the County’s Addison Evans Production and Laboratory Facility (AEWPLF) filter gallery and adjoining floor area. The floor areas to be covered are work areas so coordination with plant staff is required because not all areas will be available at any given time. The approximate total square footage of Phase I is 1,680 square feet with an optional area of 525 square feet. Phase II is approximately 670 square feet. Bidders are responsible for the exact measurements and will be given an opportunity to measure during the pre-bid conference and site visit. No additional charges will be allowed due to measurement discrepancies. Existing flooring shall not be disturbed with the exception of adhering the new floating floor to the existing floor surface. The Contractor shall be responsible for all floor transitions including four (4) existing hatch doors in Area A. Areas are directly adjacent to drinking water filters. Extreme caution and care shall be taken to avoid raising dust or getting any material into the filter basins as they are used to produce drinking water for the County. Flooring design shall be a floating floor with a surface industrially strong enough to withstand pallet jacks moving skids of 3000 pounds on a regular basis. Occasionally 6000 pound motors are set on this floor. Contractor shall notify the County whether the motors can be directly set on the floor without indentation or whether plywood will need to be placed between the motor and the floor.