Specifications include, but are not limited to: The contractor shall furnish all labor, installation, supervision, equipment, tools, parts, materials,software licenses, programming, integration as necessary, to provide electronic access controlequipmentperallspecificationshereinandinaccordancewithmanufacturer’sinstallationmanuals,servicemanualsand/orindustry’sbestpractices.Provide hardware submittals and headend design for approval before installation commencement.Installation dates must be scheduled in advance with project manager.Reuse existing Vanderbilt VRCNX-R, Schlage PIM400-485.Reuse existing Schlage FSIC cylinders. All hardware removed from aluminum doors and frames shall be blanked. All hardware removedfrom metal doors and frame shall be Bondo and sanded smooth ready for paint. COC to retain all remove parts and hardware.