Specifications include, but are not limited to: The rehabilitation of approximately 2,400 linear feet of 8-inch diameter sewer and the replacement of approximately 5,100 linear feet of sewer with new 8-inch and 12-inch diameter sewer, including one (1) 108 linear foot jack and bore operation and approximately 560 linear feet of 12-inch sewer installed by pipebursting. Also included in this project is the replacement of approximately 40 sewer service laterals, the rehabilitation of approximately 16 sewer service laterals, the installation of new standard 48-inch manholes totaling approximately 120 vertical feet, the replacement of existing manholes with new standard 48-inch manholes totaling approximately 140 vertical feet, the rehabilitation of 16 standard manholes totaling approximately 148 vertical feet. It also includes the provision of all associated erosion control, bypass pumping, pavement restoration, traffic control, and appurtenances throughout the Enterprise Parkway and Broad Street (SH-15 Part 1, Phase 1) area.