Specifications include, but are not limited to: mobilization, maintenance of traffic (vehicular and pedestrian), sweep cleaning and adjust utilities prior to heat scarification and re-compaction of existing asphalt surfaces. This project consists of all labor, materials, equipment, and supervision necessary to completely remove residue, apply slurry seal or modified latex microsurfacing, apply pavement markings and provide proper traffic control and notification as specified and perform related work as required. Modified Latex Microsurfacing, in place; Asphalt Patch - Type I (Skin Patching); Reset Sewer Manhole Casting; Reset Small Utility Casting; Type B, Class I Pavement Line Marking 4" Center Line; Type B, Class I Pavement Line Marking 4" Turn Line.