Specifications include, but are not limited to: a. The Contractor agrees to perform this contract in such a manner as not to interrupt or interfere with the operation of any existing activity on the premises or at the location of the work with any other Contractor, or FCPS personnel at the site. b. The Contractor shall at all times, keep the premises free from accumulation of waste materials or rubbish caused by the work performed. Upon completion of the work, waste materials, rubbish, tools equipment, machinery and surplus materials shall be removed from project sites. The Contractor shall clean all building surfaces and leave surrounding work area clean. c. The Contractor expressly undertakes all responsibility, either directly or through its subcontractor while performing work. d. The Contractor shall store its apparatus, materials, supplies, and equipment at the site of the work in a way to not unduly interfere with the progress of its work or the work of FCPS or any other contractor. e. The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the work. f. The Contractor shall continuously maintain protection of all work from damage and shall protect FCPS’s property from injury or loss arising in connection with the contract. The Contractor shall protect adjacent property as provided by law and the contract requirements, and shall provide and maintain all passageways, guard fences, lights and other facilities for protection required by public authority, local conditions, or any of the contract requirements. g. The Contractor, without special instruction or authorization from FCPS, is hereby permitted to act, at its discretion, in an emergency affecting the safety or life of individuals, or of the work, or of adjoining property to prevent threatened loss or injury, be instructed or authorized to act by FCPS, contractor shall so act, without appeal. Any additional compensation or extension of time claimed by the Contractor on account of any emergency work shall be determined as provided in the award. h. The Contractor shall plan and coordinate the work with the Coordinator, Facilities Improvement and/or his designated FCPS representative. i. The Contractor shall demonstrate at the conclusion of the work, to the authorized FCPS representative, that the work is fully operational and in compliance with contract specifications and codes. Any deficiencies shall be promptly and permanently corrected by the Contractor at the Contractor’s sole expense prior to final acceptance of the work. j. Contractor shall furnish all labor, materials, tools, equipment and services as may be required for electrical installation services for portable classroom trailers in accordance with the provisions of the specifications stated herein.