Specifications include, but are not limited to: 0010 00100 MOBILIZATION LUMP SUM LUMP SUM _________._____ 513 0020 00101 CONSTRUCTION SURVEYING CONSTRUCTION LUMP SUM LUMP SUM _________._____ 517 0030 00110 CLEARING AND GRUBBING LUMP SUM LUMP SUM _________._____ 301 0040 00120 REGULAR EXCAVATION CY 1,644.000 _________._____ _________._____ 303 0050 00141 BORROW EXCAVATION MIN. CBR - 10 CY 2,711.000 _________._____ _________._____ 303 0060 00155 GEOTEXTILE EMBANKMENT STABILIZATION SY 1,120.000 _________._____ _________._____ 303 0070 00591 CROSSDRAIN CD-2 LF 156.000 _________._____ _________._____ 501 0080 00595 OUTLET PIPE LF 28.000 _________._____ _________._____ 501 0090 00596 ENDWALL EW-12 EA 4.000 _________._____ _________._____ 302 0100 01150 15" PIPE LF 74.000 _________._____ _________._____ 302 0110 06150 15" END SECTION ES-1 OR 2 EA 2.000 _________._____ _________._____ 302 0120 08962 DROP INLET DI-13 TY.I EA 2.000 _________._____ _________._____ 302 0130 09150 EROSION CONTROL STONE CLASS I, EC-1 TON 6.000