Specifications include, but are not limited to: 1. Bus Shelter Panel: To include all labor, parts, costs, and equipment to replace bus shelter panels of various sizes. The panels shall be ¼” thick, clear acrylic or lexan plastic. The panels should be installed using screws or rivets. Gaskets will be required. Each project is to be completed within 30 days after receipt of order (ARO). 2. Bus Shelter Frames: To include all labor, parts, costs, and equipment to replace bus shelter frames of various sizes. Each project is to be completed within 30 days after receipt of order (ARO). 3. Debris/Trash Removal: To include all labor, costs, and equipment. All debris, and/or trash to be removed in, on or within 5 feet of any point of the shelter structure within 72 hours of request. Items to be cleaned/removed may include trash, broken glass, broken plastic, cigarette butts, etc.. Items shall be properly disposed.