Specifications include, but are not limited to: The Contractor shall provide equipment with experienced operators, labor, certified flaggers, fuel, traffic control, transportation (mobilization), tools, materials, supplies, on-site supervision and incidentals as necessary for performing paving and flexible pavement planing on various primary and secondary routes in Bland County on an as-needed basis. Work shall include removing deteriorated pavement, disposal of unsuitable materials, cleaning the area and repairing with the appropriate asphalt plant mixes. This will include short sections of the roadway, shoulders, and other special paving projects not to exceed 500 feet of continuous paving. All work performed under this contract shall be under the direction of the Contract Administrator or designee. For each assignment, the Contractor shall be required to report within five working (5) days after notification and furnish the equipment and service requested by VDOT.