The Contractor shall remove all asbestos-containing material according to the asbestos survey report and/or design specifications prepared for this project and in compliance with all EPA, OSHA, and DOLI regulations, and any other applicable law, using best practices. Recommendations are located in the survey report and/or design specifications prepared for this project. a. The Inspections Office shall send a utility release form to have water, gas, electric, and any applicable utilities disconnected. b. The contractor is responsible for the disconnection of the sewage pipe. c. Prior to any work, the Contractor shall contact Miss Utility to locate any underground utilities that may be present in the demolition area. d. The contractor shall provide to the Inspections Office a copy of the final asbestos clearance inspection prior to conducting any demolition work. e. The Contractor shall remove all footings, basement walls, basement floors, concrete slabs, asphalt, poles, posts, non-public sidewalks, and stairs. f. The Contractor is required to use water for dust control during demolition.