Specifications include, but are not limited to: 1. Hampton City Schools District The type of work involved that the contractor shall perform shall include, but not be limited to: a. Overhead line work and associated connections b. Installation and maintenance of lighting systems, including replacing bulbs and globes on poles up to 125 feet c. Repairing or replacing fixtures as necessary to restore systems to satisfactory working order d. Removing or replacing poles, crossarms, etc., including guy wiring. e. Setting and repairing time clocks and relay systems f. Installing and servicing electronic control systems g. Repairs, adjustments, installations to ornamental fountain systems. h. Work types involve 120,240,277, and 480 volt systems