Specifications include, but are not limited to: The project includes stake-holder involvement, schematic design, design development, construction documents, special inspections, geotechnical civil engineering, and other related disciplines which the A/E firm deems essential. Additionally, the project includes contract administration and commissioning for the complete modernization of the existing school (approximately 92,625 square feet), including related demolition and building additions. The modernized school facility is intended to provide for a total school capacity of 700 students, grades 6-8. Total funding for the project is seventeen million dollars and includes all design fees, construction, contingencies, and FF&E. All design and construction documents will be required to meet the standards and codes of the State of Virginia, the City of Poquoson, the Division, and Federal Regulations applicable to environmental issues. The design shall also be in accordance with ICC A117.1-2009 Accessible and Usable Buildings and Facilities Standard. Expansion of the schools technology infrastructure to accommodate current Poquoson City Public Schools standards will be required.