Specifications include, but are not limited to: New construction of a 3000 ton capacity chemical storage building –VDOT prototype design – pre-engineered, frame supported, membrane building on 10 ft. high reinforced concrete wall; 7,885 sq ft size - membrane lined holding pond 10’x70’x 6’ deep. Asphalt spreader rack pads for 15 spreaders – 22’x180’. Asphalt work pad – 83’x 50’. Building includes lighting, electrical distribution, yard hydrants, louvre ventilation, site lighting. Existing chemical storage building and salt pond must be removed prior to construction of replacement and must occur between April 1 and October 1 2021. The expected advertisement date for this project will be February 2021. New construction of an approximately 4,125 square foot, 3-bay road chemical storage building. New building is comprised of cast in place reinforced concrete walls with pre-engineered wood trusses and asphalt shingles roof system. Work includes demolition of existing approximately 4,200 square foot concrete / CMU / wood frame storage building, shoring of existing earthworks, asphalt and other site demolition, installation of (2) - 15,000 gallon underground saltwater storage tanks, new asphalt floor and mixing pad with membrane liner, storm water management system, and associated utilities for a complete and operational facility. The project is generally described as construction of an approximate 4,300 SF Combo Building including associated site demolition, site development, utilities, foundations, building envelop, interior finishes, VAC, plumbing, lighting, power, and lightning protection and a 12,200 SF Chemical Storage Building including site demolition, site development, utilities, foundations, pre-engineered frame-supported membrane building, lighting, and power along with construction of fuel station including a pre-engineered metal canopy, underground storage tanks, fuel dispensers, fuel management, lighting, power, lightning protection system, and associated systems. The project is generally described as construction of an approximate 3,930 SF Combo Building including associated site demolition, site development, utilities, foundations, building envelop, interior finishes, HVAC, plumbing, lighting, power, and lightning protection and a 12,200 SF Chemical Storage Building including site demolition, site development, utilities, foundations, pre-engineered frame-supported membrane building, lighting, and power along with construction of fuel station including a pre-engineered metal canopy, underground storage tanks, fuel dispensers, fuel management, lighting, power, lightning protection system, and associated systems.