The Work consists of furnishing all materials, equipment, and labor necessary for the installation of approximately 10,305 linear feet of 8-inch gravity sanitary sewer main, including fifty-two (52) manholes, new site inspection ports (SIPs) and new service lateral installations, installation of approximately 1,715 linear feet of 12-inch water main, approximately 3,210 linear feet of 8-inch water main, including associated interconnections, hydrants, new meter assemblies and new service line installations, associated appurtenances, and all associated clearing and grubbing, erosion control and surface restoration. Phase A Work consists of the installation of Gravity Sewer Alignment A, comprising the sanitary sewer between SSMH TMH16 and SSMH #A23, including but not limited to testing, site inspection ports, landscaping, replanting, seeding and restoration. Phase B Work consists of all other Work not included in Phase A.