Specifications include, but are not limited to: The contractor shall provide all labor, supervision, equipment, tools, materials, and incidentals necessary for the construction of a new vehicular wash station with two covered wash bays, one open-air wash bay, and one remote rinse bay. The facility is located on the airside, adjacent to the existing Snow Removal and Airport Maintenance Buildings. The wash bays will be constructed using concrete masonry unit walls with a framed roof structure and standing seam roof. In addition to new architectural and site lighting, all equipment for the facility will be new, including a wash system, pumps, vacuum, wands, and accessories, as well as heating and ventilation equipment within the mechanical room. Civil work includes tying into and modifying existing utilities, as well as new curbing and asphalt around the new facility. The project also includes modifications and upgrades to pump equipment, electrical equipment, and generator at an existing adjacent pump station, utilizing the existing wet well. All work will be performed in accordance with the specifications, construction drawings, and local code.