2.1 The contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to perform work as detailed below. • This project will be performed at the same time as the island and line replacement and should be coordinated with C-First, Inc. • Demolish the existing canopy and dispose of the canopy off-site • Excavate 2 (two) canopy footers per the contractor’s engineered drawings. All excavated materials are to be removed and dumped at 998 South Boston Rd. Danville, VA 24540. Pour a minimum of 4,000 (four thousand) PSI concrete in the footers and provide anchors • The Contractor will erect 1 (one) 48’ x 28’ (forty-eight foot by twenty-eight foot) 2 (two) column canopy • The color of the new canopy will be white, the contractor shall provide color samples to the owner representative • The contractor will install 8 (eight) weatherproof LED lights • Contractor will install the wiring to the canopy and make the final electrical connections for the canopy lights and paint canopy poles white to match the new canopy • Clean the site daily of Contractor debris