Specifications include, but are not limited to: The Contractor shall provide all required state, local and weekly Inspection, Maintenance and Repair Services to outdoor Aquatic Facilities located at Wester Branch Community Center. In so much, the Contractor shall furnish all labor, supervision, management, administrative support, materials, tools equipment, apparatus, machinery, containers, supplies, vehicles, disposal of waste material, recordkeeping, reporting and other supplies and services necessary to successfully keep the aquatic facilities, their systems and ancillary equipment in good working order, using materials of like design and composition to those originally supplied and installed per WaterPlay, City of Chesapeake, and State of Virginia guidelines. A. SPLASH PARK SEASONAL OPENING/CLOSING 1. Remove spray and feature ground covers as requested. 2. Clear feature lines pre-winterization and pre-season as requested. 3. Pressure-wash concrete decks as requested. 4. Inspect park main drains, drain grates, and hydrostatic valves. Provide a report on conditions of the aforementioned. 5. Inspect and provide a report on all aquatic filtration and disinfection systems. Provide a report on conditions of the aforementioned. Adjust/ repair where necessary to complete start-up. 6. Start park mechanical systems and inspect all systems to include filters, pumps and motors, piping, tubing, gauges, and meters. Provide a report on conditions of the aforementioned. Adjust/ repair where necessary to complete startup. 7. Start chemical feed systems and inspect all equipment including tubing, probes, controllers, and feeders. Adjust/ repair where necessary. Provide a report on conditions of the aforementioned. 8. Remove swimming pool covers at select locations as requested. 9. Make ancillary facility repairs as needed to pass State of Virginia Health Preopening Inspection. 10. Complete all preseason opening tasks and inspection no later than May 21, 2022. 11. Winterize filter systems. 12. Add antifreeze to systems as needed. 13. Box all chemical feed and loose mechanical equipment and move to storage. 14. Blow out and plug filter lines as needed. 15. Flush all chemical feed lines and tubing. 16. Complete final inspection when all winterization tasks are complete no later than September 30, 2022. Provide a report on conditions of the aforementioned