Specifications include, but are not limited to: Reclaim all remaining refrigerant in the referenced chillers into EPA approved containers and weigh. The vendor shall dispose of the reclaimed refrigerant in compliance with all applicable Federal, State and local laws and regulations. The vendor shall provide the VIB Procurement Manager all documentation indicating that the disposal of the refrigerant was done in accordance with appropriate laws and regulations. Replace both compressors with new and unused (OEM) including all associated system service valves, isolation valves and associated o-rings and gaskets, pumps, sensors, fittings, piping, connections wiring and controls, and [replace] condenser fan(s) and compressor contactors needed to make the compressors operable resulting in a fully functional cooling system for area served. In addition, install new dryer assembly with bypass to accommodate dryer replacement including the replacement of the sight glass.