a. Provide vessel prime techno adhesive #106 b. Provide insulation materials Gaco One Pass Closed Cell Foam have a minimum thickness of 1.5 inches or the thickness to achieve an R-value of approximately 6.8 per inch or greater. After inspection of the spray foam is determined to be adequate, apply two (2) coats of protective sealant Rust-oleum Noxyde product number 283090 white. c. Provide cost of paint/foam touch ups in the event of unexpected deuteriation from movement of the vessel, once the vessel is set and anchored in its final location, and final piping has been connected to the vessel. d. Deliver all materials to the job site, ensuring they are free of defects and stored properly before installation. Installation a. Install insulation material as specified by the manufacturer. b. Ensure the insulation is securely attached using appropriate fasteners, bands, or adhesives. c. Seal all joints and seams to prevent moisture ingress and thermal leaks. d. Upon completion of foam and sealant, the contractor shall ensure all flanges, ports, and other access points remain fully accessible with a reasonable clearance to allow removal of bolts, studs, and opening and closing flanges and valves.