John Heinz NWR at Tinicum requires the install of two ductless split system in the maintenance offices. This project includes providing all necessary labor, materials, tools, and supervision to install two ductless split system heat pumps. The first part of the scope includes furnishing and installing one 24,000 BTUH unit, along with refrigerant and condensate drain piping. The existing electrical feed from a window unit will be reused to power the new equipment. The system will be evacuated, charged, and placed into operation. The second part of the scope includes furnishing and installing one 12,000 BTUH unit with similar installation requirements, including reuse of the existing electrical feed, installation of refrigerant and condensate drain piping, and complete system start-up.
Site Visit: September 17, 2025, 11:00 AM EDT, POC: Larry Balsamo, 484-571-6962, Lawrence_Balsamo@fws.gov
Location: John Heinz NWR at Tinicum, 8601 Lindbergh Blvd., Philadelphia PA 19153
Questions: September 18, 2025 3:00 PM EDT, to Bill Koski, William_koski@fws.gov
Quotes Due: September 26, 2025, 3:00 PM EDT, to Bill Koski, William_koski@fws.gov
The magnitude of this project is less than $25,000.00