Specifications include, but are not limited to: The Contractor shall keep one complete set of plans, standard drawings, Contract assemblies, and Specifications available on the project at all times. For maintenance projects, certain sign projects, and other projects having no field office or on which the Contractor has no office, the Contractor shall keep one complete set of plans, Contract assemblies, and Specifications with him while prosecuting the Work. In the event items of Work are required as per the Standard Drawings, the Contractor shall also keep the appropriate Standard Drawings on the project during the performance of that work. Plans consisting of general drawings and showing such details as are necessary to give a comprehensive understanding of the work specified will be furnished by the Department. Except as otherwise shown on the plans, dimensions shown on the Plans are measured in the respective horizontal or vertical planes. Dimensions that are affected by gradients or vertical curvatures shall be adjusted as necessary by the Contractor to accommodate actual field conditions and shall be specifically denoted as “field adjusted” on the Working Drawings. Failure on the part of the Contractor to so denote field adjustments on the Working Drawings shall not relieve the Contractor of the responsibility to accommodate and incorporate such existing conditions into the finished work. MOBILIZATION ON-CALL TASK ORDER GREATER THAN $75,000 - CULPEPER DISTRICT, 1 EACH; MOBILIZATION ON-CALL TASK ORDER LESS THAN $75,000 - CULPEPER DISTRICT, 1 EACH; MOBILIZATION TASK ORDER $75,000 AND GREATER - STAUNTON DISTRICT, 2 EACH; MOBILIZATION TASK ORDER LESS THAN $75,000 - STAUNTON DISTRICT, 2 EACH; CONTRACT ESTABLISHMENT, LUMP SUM; PAVEMENT MARKING REMOVE EXISTING PAVEMENT MARKER 2,300 EA; PAVEMENT MARKING REMOVE EXISTING SNOW PLOWABLE RAISED PAVEMENT MARKER 5,000 EA; PAVEMENT MARKING REPAIR PAVEMENT VOID 2,500 EA; PAVEMENT MARKING REPLACE PAVEMENT MARKER LENS 57,050 EA