DESCRIPTION OF WORK This project is turnkey project. All mechanical, electrical and plumbing disconnection, wall modifications, removal of equipment not being reused and connection of new equipment shall be part of the contract. Extent of the work is indicated on drawings and by provisions of this section, including schedules and equipment lists associated with either drawings or this section. The Contractor shall be responsible for all required permits including the plumbing, electrical and mechanical permits. At the commencement of work all Existing Equipment to be replaced shall be disconnected, removed to a location designated by the Owner’s Representative and assembled for the Owner’s review. The Owner reserves the right of first refusal of the removed kitchen equipment. If refused, the Contractor shall remove the refused equipment from the site and dispose of same in a legal manner. The new items of equipment shall be delivered, set in place and made ready for connections under this contract. Plumbing, Electrical and Mechanical modifications and connections shall be completed under this contract by qualified trades with all necessary permits.