MOBILIZATION, MAINTENANCE OF TRAFFIC, & SURVEY 1 VDOT Spec 105 MOBILIZATION (Per General Provisions, Mobilization not to exceed 5% of total project) LS $87,000.00 $90,000.00 2 VDOT Spec 105 ROADWAY MAINTENANCE OF TRAFFIC - SIGNAGE (INCLUDING MOUNTING) EA $500.00 0.0 3 VDOT Spec 105 FLAGGERS LS $30,000.00 0.0 4 VDOT Spec 105 18" TRAFFIC CONES EA $50.00 0.0 5 VDOT Spec 105 TEST PITS EA $2,000.00 0.0 6 VDOT Spec 105 SURVEY STAKEOUT LS $25,000.00 0.0 7 VDOT Spec 105 SURVEY AS-BUILT LS $20,000.00 0.0 EROSION & SEDIMENT CONTROL 8 CFC Spec 02020 PLASTIC SAFETY FENCE LF $8.00 0.0 9 CFC Spec 02920 PERMANENT SEEDING SY $10.00 0.0 10 See Special Provisions CONCRETE WASHOUT EA $2,500.00 0.0 11 CFC Spec 02020 SUPER SILT FENCE LF $14.00 0.0 12 CFC Spec 02020 TREE PROTECTION FENCE LF $14.00 0.0 13 CFC Spec 02020 ROOT PRUNING LF $6.00 0.0 14 CFC Spec 02020 CONSTRUCTION ENTRANCE WITH WASH RACK EA $7,500.00 0.0 15 CFC Spec 02020 INLET PROTECTION EA $600.00 0.0