The water treatment plant improvements scope of work includes: • Water Treatment Plant Expansion to 4.95 MGD Capacity • Installation of Plate Settlers to Existing Sedimentation Basins • Installation of Membrane Filtration System and Building • Installation of two 500,000 Gal Above Ground Storage Tanks for Clearwells • Extend Sedimentation Basin Divider Wall to Create Break Tank • Installation of Membrane Feed Pump Station • Installation of a new Finished Water Pump Station and Building • Replace Flocculators Repairs to Sedimentation Basin Concrete • Application of Sedimentation Basin Coating System • Laboratory and Control Upgrades • Installation of Chemical Storage and Chemical Feed Building • Additions and Modifications to Instrumentation and Control Systems • New Generator • New Storage/Shop Building • Site Piping • Plant Building Architectural Upgrade including Lighting, Windows, Doors, Flooring, and Masonry Repair • Abandonment of Existing Gravity Filters • Site and Road Upgrades