Specifications include, but are not limited to: Owner requests Proposals from qualified consulting firms (Firm) to provide Professional Services including preliminary engineering report services, design services, pre-construction services, contract administration services, field engineering and inspection services, startup and testing services, and poststartup and certification services for the Kiln Creek Interceptor Force Main Replacement (Project). Information to be submitted to Owner in response to this RFP is outlined in Article 5. The Project is summarized as follows: This project, located in Newport News and York County Virginia, will upsize the existing 24-Inch Force Main (FM) to 30-Inch diameter to create a 30-Inch diameter FM loop within the James River and York River treatment plant service areas.