Weekly (two [2] times per week – Tuesday and Friday): a. Empty all trash receptacles, and place trash in the dumpster provided. b. Align all trash receptacles with new liners, if soiled. c. Spot clean carpet and rugs using stain-removers, as needed. d. Vacuum all carpets and rugs. e. Contractor will not be responsible for removal of staples from carpet. f. Sweep, damp mop and sanitize all hard surface vinyl and tile flooring and baseboards; and remove all scuffmarks. g. Clean and disinfect the drinking fountains. Spray bubbler, basin, and any push buttons or push bars with mild cleaner, disinfect and dry using a clean dry cloth. h. Scour all sinks’ exterior, interior and sink wall with mild cleaning solution, sanitize and dry with a clean dry cloth. Polish bright work. i. Thoroughly clean and sanitize restroom toilets and urinals. Apply cleaning solution to exterior (handles, toilet seat, bowl, base) and interior (rim, flush-holes, bowl, under rim of bowls, passage drains), clean and disinfect. Replace urinal screens, as needed. j. Clean and disinfect all restrooms, urine screen testing area, and kitchenette surfaces, countertops, cabinets, cabinet handles, stall doors, stall handles and locks, dispenser handles (paper towel and soap dispensers) and wall around dispensers. Using a clean damp cloth, mild soap, disinfect and dry with a clean dry cloth. Polish facet bright work. k. Clean and disinfect all mirrors and frames. Shine mirrors using glass cleaner and a clean dry cloth.