Specifications include, but are not limited to: superstructure replacement and substructure rehabilitation of five structurally deficient bridges over I95: 1st Street Bridge, 4th Street Bridge, 5th Street Bridge, 7th Street Bridge, and Broad Street (Rte. 250) Bridge. The proposed Project will replace the bridge superstructures, not only to eliminate the structural deficiencies, but also to increase the vertical clearance to a minimum of 15 feet. The width and length of the bridges will not be increased as part of this project. Substructure rehabilitation/repair will be performed on these structures. The work includes but not limited to: roadway and bridge design, survey, environmental, geotechnical, hydraulics and stormwater management, traffic control devices (including overhead sign structures), transportation management plan, right-ofway, utility relocation, construction, public involvement/relations and stakeholder coordination, quality assurance and quality control, intelligent transportation systems, lighting, construction engineering and inspection, and overall project management