Specifications include, but are not limited to: The contractor shall furnish all materials, labor, equipment, supplies and supervision to remove and dispose of the old units, replace and render operational two (2) new, like in kind and type, HVAC units to be installed at Cabin #6 and the Assistant Park Manager’s residence.; 1. Product information shall be submitted with quote for evaluation. Failure to provide Product Information may eliminate your bid from evaluation. *; 2. The contractor shall install and render operational two (2) new and unused minimum 16 SEER Two Stage HVAC units to include new refrigerant lines (line sets), fiberglass equipment pad, snow legs (if already present), matching air handler, condensate drip pan and piping outside the building foundation, adapters to old duct work, emergency/auxiliary heat strips, and programmable thermostat. ; 3. The contractor shall provide and install a matching variable speed indoor air handler adequate to meet or exceed the Air Conditioning Heating and Refrigeration Institute (AHRI) Standard 210/240.; 4. Existing electrical connection/disconnects may be used if they meet manufacturer recommendations. If not, electrical components must be replaced.; 5. The Contractor is responsible for any carpentry needed to enlarge access openings, including trim and finishing to match existing woodwork.; 6. The Contractor shall install new/unused supply and return transitions. ; 7. The contractor shall replace condensate pump on unit if one is currently installed; 8. The Contractor shall practice lock out tag out safety procedures and follow all OSHA, State and Federal guidelines during installation as building will be occupied during repairs.; 9. The Contractor shall provide and install new condensate drip pan and condensate piping outside building foundations. ; 10. Exterior units may require new foundation pads and/or snow legs and shall be installed level, if needed.