A. Haul, Wash Hull, Block Hull, Store and Launch a) Provide dockage for the vessel at the shipyard immediately prior to and after the bottom maintenance period. Godspeed will be available to arrive at the shipyard for dry-dock on or about January 12, 2026. b) Haul Godspeed by means of a marine railway, marine travel lift or dry-dock. c) Pressure wash the bottom of the hull, propellers, shafts and struts to remove normal marine fouling. Pressure wash on low setting to prevent damage to wood planking or seam caulking. d) Provide appropriate blocking for the hull. e) Provide covered storage for the vessel throughout the out of water dry-dock repair period. The covered storage building shall be of adequate height, width and length to completely enclose the vessel within the building to complete all required work. The covered storage building shall be climate controlled to allow application of specified products according to manufacturer’s recommendation. f) Provide access to Godspeed by gangplank, ladder or other means. g) Provide 120 volt, 30 amp or 240 volt, 50 amp electrical service to the vessel. Use the ship’s plug to connect to shore power.