Specifications include, but are not limited to: A. SCADA System(s): 1. Services shall be performed on an as-needed basis.; 2. Services shall include but are not limited to analysis, electrical, mechanical, components, cabling, wiring, configuration, general design, schematic design, PLC programming, modification design, PC based SCADA systems, logic controllers, instrumentation, control panels, control systems, repair, general programming, system modifications, maintenance, system integration, firmware assistance, device drivers, patches, security, service packs, revisions, database support, testing, assembling, loading, upgrades, training and on-call technical support.; 3. The Contractor shall execute various work activities in a sequence so that all systems related to SCADA communications, at all locations, are maintained throughout the project. Various threads of Work may sometimes proceed simultaneously only if the specific dependencies for communications are completed, tested in proper operation.; 4. The Contractor shall designate someone specifically available for on-call support.; 5. The Contractor shall have staff according to all projects size and complexity.; 6. The Contractor shall provide quality assurance for all Work. The Contractor shall assure that Quality control is an integral part of the Contractors engineering, production, installation, maintenance, programing and testing.; B. Preventative Maintenance: The Contractor, when requested, shall assist Owner on designing, developing and implementing a Preventative Maintenance Program.; The Contractor shall, when requested, provide some or all services including but not limited to, PLC firmware upgrades/updates, making minor PLC adjustments, PLC programming, troubleshooting Diagnostics, equipment replacements.; The Contractor shall provide, when requested, any other preventative maintenance Work not listed herein.; C. Additional Work Requirements In addition to the above illustrations, the Contractor may be requested to provide, in support of the Work, other general services as part of the installation, programming, renovation or repair and shall include, but is not limited to, demolition, removal and disposal of debris; temporary protection as needed for adjacent Work, compatible products or materials with existing systems and/or materials, providing the required documents, plans, paperwork to the local all utility providers, coordinate excavation and/or grading; communicate with local utility and local property owner if required, provide labeling of equipment and/or signage that maybe requested.; 3.2. The Contractor shall notify and schedule five (5) business days in advance of any outage with the Owner when the interruption causes the least interference with business operations and routines. The outage shall not start until Contractor has coordinated and received in writing an approval from the Owner prior to implementing.; 3.3. The Contractor shall provide temporary power, as required, for the Work.; 3.4. The Contractor shall investigate and assess the condition of the Work area before providing a proposal.; 3.5. All Work specified herein will be paid for at the contracted firm-fixed hourly rates as indicated in the ATTACHEMENT B, PRICING SCHEDULE.