Project consist of the installation: Upgrades inside the pump station shall include replacement of the Motor Control Center (MCC) and associated medium voltage transformers, demolition/abandonment of older systems affected by the replacement of the MCC; reconnection of low voltages equipment to the new motor control center; addition of an automatic transfer switch upstream of new MCC; replacement of existing four Variable Frequency Drives for the 600HP pumps; contractor to troubleshoot the existing Switchgear to resolve the “powerflicker” issue; contractor shall implement solution where switchgear transfer scheme controller responds to single-phase and three-phase events on the VEPCO system; perform power system studies such as short circuit studies, protective device coordination studies, and arc flash risk assessment; installation of 4-section fuse interrupter 4160VAC Switchgear to serve as a connection point for a portable generator as a second back up method for the pump station; and include new conductors and conduit installation.