E Wilson Morrison: • Remove broadloom carpet from 6 classrooms and dispose of in WCPS provided dumpster. • Room 102:30 x 22, 660 sq. ft., Room 103: 30 x 22, 660 sq. ft., Room 104: 26 x 24, 624 sq. ft., Room 105: 26 x 24, 624 sq. ft., Room 106: 25 x 24, 600 sq. ft., Room 107: 24 x 24, 576 sq. ft. • Prepare floors for LVP flooring and repair and cracks or breaks as needed. • All furniture and equipment will be removed prior to project start. • Supply and install LVP flooring that is adequate for use in school classrooms and can withstand heavy foot traffic. • Supply and install cove base. • Color of new LVP flooring to match existing VCT flooring in each classroom. • Supply all adhesives and materials needed to complete project. • Work to be done during WCPS winter break (December 20th, 2025 through January 2nd, 2026) Hilda J Barbour: • Remove broadloom carpet from 5 classrooms and dispose of in WCPS provided dumpster. • Room 1:35 x 25, 875 sq. ft., Room 3: 35 x 25, 875 sq. ft., Room 5: 35 x 25, 875 sq. ft., Room 7: 35 x 25, 875 sq. ft., Room 9: 35 x 25, 875 sq. ft. • Prepare floors for LVP flooring and repair and cracks or breaks as needed. • All furniture and equipment will be removed prior to project start. • Supply and install LVP flooring that is adequate for use in school classrooms and can withstand heavy foot traffic. • Supply and install cove base. • Color of new LVP flooring to match existing VCT flooring in each classroom. • Supply all adhesives and materials needed to complete project. • Work to be done during WCPS Thanksgiving Break (November 22nd, 2025 through November 28th, 2025)