**Attached RFI questions have been posted and the deadline to submit has been extended to May 13, 2025.
The objective of this contract is to provide MSD with Design Review Services (Junior Architect, Junior Interior Designer and Senior Architect).
The contractor will be reviewing services to include, but not limited to, facility assessments, strategic facility planning, data collection, engineering/building systems (mechanical/electrical/plumbing), communication and information technology infrastructure, structural surveys, space situation, summaries, space requirements reports, performance specifications and cost estimates, block and stack plans, space plans/layouts, interior design: finishes and color selection, architectural design: review of design and construction phase drawings and specifications, construction review and punch lists, furniture review and punch lists, design of system upgrade, and replacement projects, design of physical security and surveillance systems, special forced entry, and ballistic resistant construction, hazardous material abatement and removal design/specification, and existing condition documentation.