Specifications include, but are not limited to: It is the intent of this Contract to secure services to remove the existing 100KW exterior Natural gas generator, with the associated automatic transfer switch from Westfield High School. The new 100KW Natural gas generator will be installed on original concrete pad inside the fenced Chiller area described on drawings. Natural gas fuel supply and conduits for the feeders and control wires and as described in these specifications.; A. The Contractor shall install the new 225-amp Automatic Transfer switch in the electrical room on strut at the previous switch location. Modification to be made to existing conduits to accommodate installation of new transfer switch.; B. The Contractor shall reuse all 1/0 feeder and load conductors for the new transfer switch, but may need to extend conductors if necessary, for proper installation. Copper compression splices with heavy duty heat shrink shall be used on all extensions.; C. The 1/0 feeders, 120volt circuit for battery charger and block heater and control wiring located at original generator pad shall be re-used to install new generator on existing pad.; D. Replace original annunciator behind Engineers office with new Cummins PowerCommand annunciator. Replace wiring/cabling with proper size and type from generator to new annunciator if needed as required by Cummins.; E. The Contractor shall reuse the existing pipeline and eight #14 THHN signaling wires in the transfer switch to the pull box over the transfer switch for the run/fault and security relays. Disconnection and re-instillation may need to be coordinated with FCPS Fire alarm Technician.; F. Contractor shall use existing gas line and make all necessary alterations for proper installation in coordination with local and IFGC codes.; G. As the current generator is inoperable, the Contractor shall furnish and install a backup temporary generator with cabling, control wires to the school emergency electrical system while the generator project is in transition. The temporary generator and cabling will be removed upon project completion. All temporary building penetrations shall be repaired by the Contractor. The area around the portable and existing generator shall be enclosed in a temporary fence.; H. The Contractor shall ensure all applicable NEC an IPC codes will be followed.; I. It is the intention of these Specifications to call for finished work, tested and ready for operation.; J. Any apparatus, appliances, materials, or work not indicated but mentioned in these Specifications, or vice versa, or any incidental accessories necessary to make the work complete and perfect in all respects and ready for operation, even if not particularly specified, shall be furnished, delivered, and installed by this Contractor at no additional expense to the Owner.; K. Minor details not usually shown or specified, but necessary for the proper installation and operation shall be included the same as if herein specified.