I. SCOPE OF WORK A. Contractor to furnish all labor, materials, and equipment as necessary to provide complete and continuous vegetative maintenance at all rights-of-way, landscape easements and roadway medians, and all other work connected thereto as specified below: The listed areas and attached spread sheets are estimates only. The Contractor is responsible for maintaining all right of way areas at the submitted unit cost and at no additional cost to the Owner. When directed by the Owner or designee the Contractor shall speak with and meet with the assigned Landscape Management Inspector on the site upon which the work is to be performed. Failure of the Contractor to meet with the Landscape Management Inspector shall not relieve the Contractor of the responsibility for the proper execution of the work assigned in accordance with the specifications contained herein.. 63.27 Acres