Arlington County will relocate several County offices to a portion of the 6th floor of the Bozman Government Center. About half of the 6th floor, approximately 14,360 square feet will be renovated in this project. There is an existing 24/7 Network Operation Center (NOC) in this location today, and some of that IT infrastructure will be reused. A portion of the project including the Situational Awareness and Intelligence Unit (SAIU), the ESF, and the nearby support and conference rooms will need the ability to operate 24/7. These areas will be separated from the base building HVAC. A new AHU will replace the existing core (Landlord) unit and will be connected to a new rooftop dry cooler. There is a County owned & maintained generator in the NOC which serves the NOC and will be replaced with a new one of the same size. The landlord's life safety generator will remain, but the fuel tank is being increased in size to extend its run time. There will be three Motorola antennas added to the roof.