Specifications include, but are not limited to: The Contractor shall be fully capable of performing the required services as needed to allow the DMV location to open and conduct business as scheduled. Grounds men shall be used to shovel snow from sidewalks, steps, and entrance ways. Ice Melt/Surface Icing a) During icy conditions, or upon direction from the Contract Administrator, the Contractor shall spread sand, chemical treatment (i.e. ice melt) or chemically treated sand when surface icing has occurred. The price provided for de-icing shall be all-inclusive (labor, material, equipment, and supplies). b) Unless preauthorized by the Contract Administrator in writing, pretreatment (liquid or chemical) of paved surfaces is not required. Liquid chemical pretreatment shall be separately priced and not included with the push (event) rate.