Roadway 1 513 MOBILIZATION 1 LS 2 517 CONSTRUCTION SURVEYING (CONSTR.) 1 LS 3 301 CLEARING AND GRUBBING 1 LS 4 515 FLEXIBLE PAVEMENT PLANING 0"-2" 9,415 SY 5 508 DEMOLITION OF PAVEMENT FLEXIBLE 1,862 SY 6 315 SAW-CUT ASPHALT CONCRETE 4,625 LF 7 315 ASPHALT CONCRETE TY. SM - 9.5A 140 TON 8 315 ASPHALT CONCRETE TY. SM - 9.5D 1,435 TON 9 315 ASPHALT CONCRETE TY. IM-19.0A 404 TON 10 315 ASPHALT CONCRETE TY. BM-25.0A 1,264 TON 11 315 ASPHALT CONCRETE TY. BM-25.0D 92 TON 12 308 AGGR. BASE MATL. TY. I NO. 21B 4,888 TON 13 310 TACK COAT 2,706 GAL 14 303 REGULAR EXCAVATION 7,138 CY 15 305 BORROW EXCAVATION 4,200 CY 16 303 UNDERCUT EXCAVATION 2,500 CY 17 303 GEOTEXTILE FABRIC 8,227 SY 18 502 STD. CURB CG-3 996 LF 19 502 RADIAL CURB CG‐3 180 LF 20 502 STD. COMB. CURB & GUTTER CG-7 2,296 LF 21 502 RAD. COMB. CURB & GUTTER CG‐7 685 LF 22 502 ENTRANCE GUTTER CG-9D 20 SY 23 504 CG-12 DETECTABLE WARNING SURFACE 21 SY 24 504 HYDR. CEMENT CONC. SIDEWALK 4" 1,394 SY 25 511 ALLAYING DUST 320 HR 26 502 MEDIAN STRIP MS‐1A 195 SY 27 ATTD COLLAPSIBLE BOLLARD 9 EA 28 608 MOWING 100 HR Signing and Pavement Markings 29 700 SIGN POST STP-1, 2", 14 GAGE 61 LF 30 700 SIGN POST STP-1, 2 1/2", 12 GAGE 135 LF