Specifications include, but are not limited to: 6 new facilities totaling 22,000 square-feet. The project as a whole will achieve LEED Campus with two buildings achieving LEED Certification. The new buildings will include a 3,500 square-foot Administration Center, a 2,000 square-foot Aquaculture Facility, a 4,000 square-foot Education Center, a 1,300 square-foot Maintenance Storage building, a 4,800 square-foot Maintenance Facility shop, and a 6,000 square-foot Visitor’s Center. Building construction and materials will mimic the recently added adjacent structures: Seawater Research Lab and Seaside Hall. This project will replace existing older facilities, to include the demolition of 13 structures. New site infrastructure to include central alley access, septic drain field and parking, in order to support the new buildings. The Project will be sequenced to allow for campus operations to continue throughout the construction duration. The project site is located within a floodplain.