Specifications include, but are not limited to: The systems and subsystems for which commissioning is requested are as follows: A HVAC Systems/ and terminal Equipment 1 HVAC Control systems 2 Chillers 3 Chilled water system and pumps; 4 Boilers; 5 Hot water system and pumps; 6 Cooling Towers; 7 Condenser water system and pumps; 8 Fans; 9 Rooftop Unit; 10 Make-up air units; 11 Computer room air conditioning units; and 12 VAV Terminal Units. B Integrated Building Automation System: 1 Control panels, 2 operator station, graphic displays; 3 Data alarming and trending; 4 Field sensors and equipment interfaces; 5 Operating sequences and controls; 6 Security systems 7 Fire protection and fire alarm systems C Plumbing Systems 1 Domestic water heaters and recirculation plumbing; 2 Sump pumps; 3 Sewage ejector pumps; and 4 All other related plumbing systems and subsystems to reduce the risks of system malfunction after occupancy/ ensuring beneficial use. D Electrical System: 1 Lighting controls including occupancy sensors; 2 Daylighting sensors, and interface with building automation system; and 3 Emergency power system including generator, switchgear, transfer switches, and controls. 4 Electronic Access Controls 5 Fire Alarm Control Panels