Specifications include, but are not limited to: FiberLync and the selected Contractor(s) will each be supplying certain equipment and materials for this project as per the table below. The Contractor will be expected to develop, with FiberLync, a list of required installation materials. For materials that are provided by FiberLync, FiberLync will inventory those items and make them available for pick-up at a designated location. The Contractor will be responsible for all materials once they are received from FiberLync. Material FiberLync Contractor Fiber Drop Cables ✓ Fiber ✓ Duct ✓ Handholes ✓ Vehicles and Equipment ✓ Offeror(s) are responsible for providing all required tools, vehicles, and test equipment to carry out the tasks listed in this request for proposal. All contractor personnel will be required to adhere to the highest quality standards of customer service and workmanship. The Contractor shall be responsible for maintaining satisfactory standards of employees' competency, conduct, courtesy, appearance, honesty, and integrity, and shall be responsible for taking such disciplinary action with respect to any employee, as may be necessary. FiberLync may request that the Contractor remove from this assignment any employee found unfit due to failure to adhere to customer service or workmanship standards.