Main Entrance Drive Aisle, Front parking lot, VDOT SM-9.5A (non-polishing aggregate). (Approximately 1,166 Sq/Yds) 1. Overlay/Resurface with 1.5” VDOT SM-9.5A (non-polishing aggregate). 2. Full Width Mill and Remove 1.5” of existing asphalt as designated on attached map. 3. Mill and remove 1.5”-0” at seams and concrete curbing, as needed. 4. Be aware of electrical box during milling and paving (marked on map). 5. Stripe according to map. Circular Drive and Handicap Parking, VDOT SM-9.5A (non-polishing aggregate) (Approximately 981 Sq/Yds) 1. Overlay/Resurface with 1.5” VDOT SM-9.5A (non-polishing aggregate). 2. Full Width Mill and Remove 1.5” of existing asphalt as designated on attached map. 3. Full Width Mill and Remove 1.5”-0” of existing asphalt at seams, concrete curbing and concrete sidewalks. 4. Stripe according to map. Upper Parking Lot (at tennis court), VDOT SM-9.5A (non-polishing aggregate) (Approximately 1313 Sq/Yds) 1. Overlay/Resurface with 2.0” to 1.5” VDOT SM-9.5A (non-polishing aggregate). 2. 2.0” overlay along sidewalk and curbing 3. 1.5” overlay through mid-section of parking aisle. 4. Mill and remove 1.5”-0” of existing asphalt at wedge for asphalt seams, marked on map. 5. Stripe according to map.