OPTION 1: Pricing should include, 1. Tying into the existing well at the Comfort Station, completions of Phase II (6 sites), PHASE II (11sites), and PHASE III (11 sites) according to the phasing plan provided (Attachment 2). 2. Shutoffs to isolate each zone. 3. A wood & gravel foundation base, heat tape and insulation for each hydrant (like what is shown in image 1 on the reference image page). 4. Flagging for any access points 5. As-built drawings once the job is complete. (see Part II of general conditions) OPTION 2: All items in OPTION 1 also to include phase IV (9 sites) according to the phasing plan OPTION 3: All items in option 1&2 also to include Phase V & Phase IV (15 sites). This pricing would be to complete all phases according to the phasing plan. All materials/cut sheets should be submitted as soon as possible after award for the engineer and Nova Parks to review and approve.