The Work consists of, but is not limited to, the following: 1. Demolition, site work, paving, pathway, signage, and landscaping; the construction of site improvements as shown on the Plans and specified hereinafter, including: a. Site preparation including construction fences, tree protection fencing, temporary erosion and sediment control measures, test pits and construction stake-out. b. Protection and maintaining and all other existing park property, Arlington County right-of-way, and other existing improvements as required. c. Site restoration of all facilities damaged by construction operations, or as directed by Department of Parks and Recreation (DPR), to the original condition and/or the satisfaction of DPR. Site restoration includes, but is not limited to, pavement restoration, site grading, topsoil, seeding and sodding. 2. Site Improvements: a. Construction of pathways, including but not limited to prefabricated crossing, as shown on the Plans and Specifications. b. Milling and paving of existing trails as shown on the Plans and Specifications. c. Construction of concrete paving, concrete curbs, and aggregate base as shown on the Plans and Specifications. d. Painting of existing railings as shown on the Plans and Specifications. e. Installation and relocation of signage as shown on the Plans and Specifications. f. Plantings as shown on the Plans and Specifications.