1. Remove existing flooring system, including but not limited to adhesives, coatings, and contaminants. 2. Repair all cracks or damaged concrete using appropriate materials. 3. Clean surface thoroughly throughout the project. 4. Furnish and install a complete epoxy flooring system. The epoxy flooring system must meet project-specific performance requirements and industry standard requirements. 5. Ensure seamless transition from floor to wall. 6. Allow full cure time as per manufacturer’s recommendations before traffic or equipment use. 7. All debris and waste materials must be removed from the premises. 8. All goods and services to be warrantied. 9. Provide proposed project timeline, including start date and completion date.